Permits
1
Max Depth
1,600 ft
First Permit
1983-12-27
Latest Activity
1983-12-27
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-01-16
Shut-In
—
Plugged
2002-07-25
EWA / Permit operator mismatch
Scheduling: V & B OIL ≠ Permit: STEBAR ENERGY CORPORATION
Resolved via: scheduling → V & B OIL
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2003-08
Operator History
originally filed by STEBAR ENERGY CORPORATION — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (1)
CSV| Formation | Top Depth (MD) |
|---|---|
| NAVARRO | 1,366 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗
Perforations (2)
| Interval | Type |
|---|---|
| 1,366–1,376 ft | Perforated |
| 1,388–1,398 ft | Perforated |
Casing (1)
| Size | Set Depth | Cement |
|---|---|---|
| 4.5" | 1,492 ft | 191 sx |
Permit History (1)
Applications (1)
Records & Logs
4 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet