42-187-32789

Final Completion

BRIETZKE ESTATE

GUADALUPE County · District 1 · MCLAIN EXPLORATION INC. · LA VERNIA

Permits

1

Max Depth

1,000 ft

First Permit

1984-06-13

Latest Activity

1984-06-13

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-08-29

Shut-In

Plugged

1994-03-18

!

EWA / Permit operator mismatch

Scheduling: MCLAIN EXPLORATION INC. ≠ Permit: J W J OIL CORPORATION

Resolved via: schedulingMCLAIN EXPLORATION INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Operator History

originally filed by J W J OIL CORPORATION — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (1)

CSV
FormationTop Depth (MD)
NAVARRO 725 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Perforations (1)

IntervalType
726–740 ftPerforated

Casing (1)

SizeSet DepthCement
4.5"807 ft81 sx

Permit History (1)

Applications (1)

#241982 A J W J OIL CORPORATION
received 1984-06-13

Records & Logs

2 completion filings on record.

W-2/G-1 1984-10-04
W-2/G-1 1984-10-13

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in GUADALUPE County.

Well Details

Well Number
26
Max Depth
1,000 ft
Drill Type
Vertical
County
GUADALUPE
District
1
Completed
1984-08-29

Operator

Location
BOERNE
P-5 Status
Inactive (filed 2001-06-11)
Cum Oil (all leases)
17,632 bbl
Cum Gas (all leases)
112,315 mcf
Total Permits
17