42-187-33065

Final Completion

CARTER ANNETTE BONDALE

GUADALUPE County · District 1 · ENERGON3 · LA VERNIA

Permits

1

Max Depth

1,000 ft

First Permit

1985-07-26

Latest Activity

1985-07-26

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1987-10-01

Shut-In

Plugged

!

EWA / Permit operator mismatch

Scheduling: ENERGON3 ≠ Permit: J.S.J. ENERGY

Resolved via: schedulingENERGON3

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Operator History

Chain of Custody

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (1)

CSV
FormationTop Depth (MD)
NAVARRO 712 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Perforations (1)

IntervalType
712–722 ftPerforated

Casing (1)

SizeSet DepthCement
4.5"780 ft90 sx

Permit History (1)

Applications (1)

#281185 A J.S.J. ENERGY
received 1985-07-26

Records & Logs

3 completion filings on record · 1 with log images at RRC.

W-2/G-1 1988-01-12
W-2/G-1 1986-03-20 log on file
W-2/G-1 1986-05-01

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in GUADALUPE County.

Well Details

Well Number
16
Max Depth
1,000 ft
Drill Type
Vertical
County
GUADALUPE
District
1
Operator
ENERGON3
Completed
1987-10-01

Operator

Location
ROWLETT
P-5 Status
Delinquent (filed 2021-10-12)
Cum Oil (all leases)
11,989 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
4