Permits
2
Max Depth
8,000 ft
First Permit
1978-10-10
Latest Activity
2004-07-20
Lifespan
26 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
1978-11-01
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2004-09
Last Production
2026-07
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (3) Elevation 3,050 ft (GL)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| KC | 5,750 ft | -2,700 ft |
| HEPLER | 6,413 ft | -3,363 ft |
| CHEROKEE | 6,650 ft | -3,600 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (4)
| Interval | Type |
|---|---|
| 5,802–5,805 ft | Perforated |
| 5,883–5,886 ft | Perforated |
| 5,920–5,944 ft | Perforated |
| 6,048–6,052 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 1,607 ft | 750 sx |
| 5.5" | 6,623 ft | 240 sx |
Permit History (2)
Applications (2)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 2088
- Max Depth
- 8,000 ft
- Drill Type
- Vertical
- County
- HANSFORD
- District
- 10
- Operator
- MEREX RESOURCES, INC.
Operator
- Name
- MEREX RES, INC
- Location
- AMARILLO
- P-5 Status
- Inactive (filed 2018-11-01)
- Cum Oil (all leases)
- 828,425 bbl
- Cum Gas (all leases)
- 697,657 mcf
- Total Permits
- 21