42-195-31593

Final Completion

HAND

HANSFORD County · District 10 · PABLO ENERGY INC. · WILDCAT

RRC Lookup

Permits

2

Max Depth

8,500 ft

First Permit

2003-01-27

Latest Activity

2004-01-23

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2003-02-08

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: PABLO ENERGY INC. ≠ Production: WESTWIND OIL AND GAS INC. (reported 2012-11)

Resolved via: schedulingPABLO ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2003-02

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#539485 A PABLO ENERGY, INC.
received 2003-12-09
#527509 A PABLO ENERGY, INC.
received 2003-01-21

Well Details

Well Number
1
Max Depth
8,500 ft
Drill Type
Vertical
County
HANSFORD
District
10
Completed
2003-02-08

Operator

Location
PAMPA
P-5 Status
Y (filed 2005-12-02)
Cum Oil (all leases)
123,138 bbl
Cum Gas (all leases)
6,391,433 mcf
Total Permits
60

External Links

Live © 2026 Petrora