Permits
2
Max Depth
9,200 ft
First Permit
1981-11-19
Latest Activity
1988-06-27
Lifespan
7 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Formation Tops (6) Elevation 1,547 ft
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| NOBLE LIME | 4,500 ft | -2,953 ft |
| PALO PINTO LIME (Palo Pinto) | 5,700 ft | -4,153 ft |
| ATOKA CONGLO. (Atoka) | 6,200 ft | -4,653 ft |
| MISSISSIPPIAN CHESTER (Mississippian) | 7,700 ft | -6,153 ft |
| MISSISSIPPIAN MERAMEC (Mississippian) | 8,425 ft | -6,878 ft |
| MISSISSIPPIAN CHAPPEL (Mississippian) | 8,538 ft | -6,991 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (2)
| Interval | Type |
|---|---|
| 8,538–8,560 ft | Perforated |
| 8,841–8,846 ft | Perforated |
Casing (4)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 430 ft | 350 sx |
| 2.375" | 8,579 ft | — |
| 4.5" | 8,800 ft | — |
| 4.5" | — | 150 sx |
Permit History (2)
Applications (2)
#347895 A UNITED PETROLEUM CORPORATION
received 1988-06-17
#141646 A CRAWFORD ENERGY
received 1981-11-19
Records & Logs
2 completion filings on record.
W-2/G-1 1988-03-08
W-2/G-1 1982-03-04
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HARDEMAN County.
Well Details
- Well Number
- 1
- Max Depth
- 9,200 ft
- Drill Type
- Vertical
- County
- HARDEMAN
- District
- 9
- Operator
- UNITED PETROLEUM CORPORATION
Operator
- Name
- UNITED PETRO CORP
- Location
- DALLAS
- P-5 Status
- Inactive (filed 1992-04-20)
- Total Permits
- 14