42-197-30597

Final Completion

PARKER-BRANDON UNIT #1

HARDEMAN County · District 9 · HARDING EXPLORATION, INC.

Permits

2

Max Depth

9,000 ft

First Permit

1983-08-30

Latest Activity

1984-08-30

Lifespan

1 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

1983-10-04

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2000-09

Operator History

Chain of Custody

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (1) Elevation 1,428 ft

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
PALO PINTO 5,824 ft-4,396 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (3)

IntervalType
5,824–5,836 ftPerforated
5,880–5,885 ftPerforated
?–5,836 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"600 ft
8.625"600 ft
4.5"6,450 ft500 sx

Permit History (2)

Applications (3)

#250076 A HARDING EXPLORATION, INC.
received 1984-12-21
#250076 A HARDING EXPLORATION, INC.
received 1984-08-20
#208612 A MARSH, TOM F. INC.
received 1983-08-30

Records & Logs

4 completion filings on record.

W-2/G-1 1988-02-16
W-2/G-1 1988-11-29
W-2/G-1 1985-01-10
W-2/G-1 1985-03-01

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HARDEMAN County.

Well Details

Well Number
1
Max Depth
9,000 ft
Drill Type
Vertical
County
HARDEMAN
District
9

Operator

Location
WICHITA FAL, LS
P-5 Status
Inactive (filed 2016-10-27)
Cum Oil (all leases)
10,246 bbl
Cum Gas (all leases)
— mcf
Total Permits
27