Permits
2
Max Depth
8,496 ft
First Permit
1983-10-14
Latest Activity
1984-08-31
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2004-09
Injection / Disposal
Permitted Volume
300 bbl/d
Max Pressure
500 psi
Injection Interval
4,682–4,720 ft
Injected (12mo)
—
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (6) Elevation 1,498 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| PALO PINTO | 5,448 ft | -3,950 ft |
| CONGLOMERATE | 7,518 ft | -6,020 ft |
| CLEAN LIME | 7,698 ft | -6,200 ft |
| CHESTER | 7,912 ft | -6,414 ft |
| ELLENBURGER | 8,110 ft | -6,612 ft |
| CHAPPEL | 8,446 ft | -6,948 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (2)
| Interval | Type |
|---|---|
| 4,682–4,720 ft | Perforated |
| 8,110–8,150 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 855 ft | 600 sx |
| 5.5" | 8,482 ft | 300 sx |
| 5.5" | 8,492 ft | 600 sx |
Permit History (2)
Applications (2)
Records & Logs
5 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 8,496 ft
- Drill Type
- Vertical
- County
- HARDEMAN
- District
- 9
- Operator
- PHILLIPS OIL COMPANY
Operator
- Name
- PHILLIPS OIL CO
- Location
- HOUSTON
- P-5 Status
- Inactive (filed 1985-03-05)
- Total Permits
- 94