42-199-30166
Final CompletionGULF-CHOATE FEE -B-
HARDIN County · District 3 · ARROWHEAD OPERATING INC. · BATSON NEW
Permits
1
Max Depth
2,994 ft
First Permit
1979-05-21
Latest Activity
1979-05-21
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-11-22
Shut-In
—
Plugged
1988-06-20
EWA / Permit operator mismatch
Scheduling: ARROWHEAD OPERATING INC. ≠ Permit: CREBBS, CHESTER M.
Resolved via: scheduling → ARROWHEAD OPERATING INC.
Operator History
originally filed by CREBBS, CHESTER M. — asset transferred
Formation Tops (1)
CSV| Formation | Top Depth (MD) |
|---|---|
| CAP ROCK | 3,360 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗
Perforations (4)
| Interval | Type |
|---|---|
| 2,929–2,935 ft | Perforated |
| 2,939–2,953 ft | Perforated |
| 2,959–2,963 ft | Perforated |
| 2,972–2,994 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 9.625" | 520 ft | 266 sx |
| 2" | 2,911 ft | — |
| 5.5" | 3,379 ft | 565 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 11
- Max Depth
- 2,994 ft
- Drill Type
- Vertical
- County
- HARDIN
- District
- 3
- Operator
- ARROWHEAD OPERATING INC.
- Completed
- 1985-11-22
Operator
- Name
- ARROWHEAD OPER INC
- Location
- ARGYLE
- P-5 Status
- Active (filed 2025-12-10)
- Cum Oil (all leases)
- 469,661 bbl
- Cum Gas (all leases)
- 815,072 mcf
- Activities
- GTHS/G, OPRS/G, OPRS/O
- Total Permits
- 57