42-199-31465

Final Completion

T. T. CO. FEE

HARDIN County · District 3 · RADCO OPERATIONS L.P. · SOUR LAKE

Permits

1

Max Depth

2,100 ft

First Permit

1980-07-16

Latest Activity

1980-07-16

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-12-31

Shut-In

Plugged

2025-06-06

!

EWA / Production operator mismatch

Scheduling: RADCO OPERATIONS L.P. ≠ Production: TEXAS PETROLEUM INVESTMENT CO. (reported 2026-03)

!

EWA / Permit operator mismatch

Scheduling: RADCO OPERATIONS L.P. ≠ Permit: TEXACO INC.

Resolved via: productionTEXAS PETROLEUM INVESTMENT CO.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Injection / Disposal

H-1 Injection Plugged 2025-06-12 UIC #000046991 permitted 1982-04-08

Permitted Volume

78 bbl/d

Max Pressure

520 psi

Injection Interval

400–1,085 ft

Injected (12mo)

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
1,041–1,085 ftPerforated

Casing (3)

SizeSet DepthCement
10.75"192 ft225 sx
3.5"951 ft
7"1,034 ft350 sx

Permit History (1)

Applications (1)

#86854 A TEXACO INC.
received 1980-07-16

Records & Logs

2 completion filings on record.

W-2/G-1 1984-01-31
W-2/G-1 1984-01-31

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HARDIN County.

Well Details

Well Number
743
Max Depth
2,100 ft
Drill Type
Vertical
County
HARDIN
District
3
Completed
1983-12-31

Operator

Location
SOURLAKE
P-5 Status
Active (filed 2025-12-22)
Cum Oil (all leases)
1,625,820 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
50