42-199-31472

Final Completion

CHOATE FEE

HARDIN County · District 3 · TANDEM ENERGY CORPORATION · BATSON NEW

Permits

1

Max Depth

2,800 ft

First Permit

1980-08-05

Latest Activity

1980-08-05

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-04-02

Shut-In

Plugged

1989-07-12

!

EWA / Permit operator mismatch

Scheduling: TANDEM ENERGY CORPORATION ≠ Permit: PORTER, JAMES W.

Resolved via: schedulingTANDEM ENERGY CORPORATION

Operator History

originally filed by PORTER, JAMES W. — asset transferred

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
2,489–2,494 ftPerforated

Casing (3)

SizeSet DepthCement
7.625"487 ft125 sx
2.375"2,466 ft
4.5"2,575 ft333 sx

Permit History (1)

Applications (1)

#88715 A PORTER, JAMES W.
received 1980-08-05

Records & Logs

1 completion filing on record.

W-2/G-1 1981-04-30

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HARDIN County.

Well Details

Well Number
14
Max Depth
2,800 ft
Drill Type
Vertical
County
HARDIN
District
3
Completed
1981-04-02

Operator

Location
HOUSTON
P-5 Status
Active (filed 2025-07-10)
Cum Oil (all leases)
3,731,968 bbl
Cum Gas (all leases)
10,685,287 mcf
Activities
OPRS/G, OPRS/O
Total Permits
138