Permits
1
Max Depth
4,800 ft
First Permit
1985-06-28
Latest Activity
1985-06-28
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1987-05-08
Shut-In
—
Plugged
1988-10-04
EWA / Permit operator mismatch
Scheduling: CCT & CO. ≠ Permit: B-J ENERGY ENTERPRISES, INC.
Resolved via: scheduling → CCT & CO.
Operator History
originally filed by B-J ENERGY ENTERPRISES, INC. — asset transferred
Formation Tops (3) Elevation 69 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| MIOCENE (Miocene (undifferentiated)) | 2,000 ft | -1,931 ft |
| FRIO | 3,400 ft | -3,331 ft |
| CAP ROCK | 4,300 ft | -4,231 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (2)
| Interval | Type |
|---|---|
| 2,864–2,878 ft | Perforated |
| 3,350–3,360 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 733 ft | 280 sx |
| 5.5" | 4,595 ft | 1,000 sx |
Permit History (1)
Applications (1)
Records & Logs
3 completion filings on record · 2 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet