Permits
1
Max Depth
4,500 ft
First Permit
1985-06-28
Latest Activity
1985-06-28
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
1995-09-01
EWA / Permit operator mismatch
Scheduling: CCT & CO. ≠ Permit: B-J ENERGY ENTERPRISES, INC.
Resolved via: scheduling → CCT & CO.
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1996-01
Operator History
originally filed by B-J ENERGY ENTERPRISES, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (3)
| Interval | Type |
|---|---|
| 3,249–3,275 ft | Perforated |
| 3,522–3,530 ft | Perforated |
| 4,268–4,276 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 746 ft | 290 sx |
| 5.5" | 4,412 ft | 900 sx |
Permit History (1)
Applications (1)
Records & Logs
4 completion filings on record · 2 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet