42-199-32361

Final Completion

RODGERS H. L.

HARDIN County · District 3 · RADLEY EQUIPMENT · SOUR LAKE

Permits

1

Max Depth

1,650 ft

First Permit

1986-02-18

Latest Activity

1986-02-18

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1988-09-20

Shut-In

Plugged

1994-11-23

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1997-02

Injection / Disposal

W-14 Disposal Plugged 1994-11-30 UIC #000060171 permitted 1986-05-15

Permitted Volume

2,500 bbl/d

Max Pressure

Injection Interval

1,450–1,550 ft

Injected (12mo)

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
1,470–1,501 ftPerforated

Casing (2)

SizeSet DepthCement
9.625"209 ft190 sx
5.5"1,470 ft303 sx

Permit History (1)

Applications (1)

#297901 A RADLEY EQUIPMENT
received 1986-02-18

Records & Logs

2 completion filings on record.

W-2/G-1 1988-10-26
W-2/G-1 1988-11-11

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HARDIN County.

Well Details

Well Number
2
Max Depth
1,650 ft
Drill Type
Vertical
County
HARDIN
District
3
Completed
1988-09-20

Operator

Location
SOURLAKE
P-5 Status
Inactive (filed 2000-08-09)
Cum Oil (all leases)
22,977 bbl
Cum Gas (all leases)
— mcf
Total Permits
18