42-199-32441

PRODUCING

GILBERT OIL COMPANY

HARDIN County · District 3 · RADCO OPERATIONS L.P. · SOUR LAKE

Permits

1

Max Depth

1,000 ft

First Permit

1987-10-07

Latest Activity

1987-10-07

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

1987-11-03

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: RADCO OPERATIONS L.P. ≠ Permit: ATCO PROD. CO., INC.

Resolved via: productionRADCO OPERATIONS, L.P.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (1) Elevation 3 ft (KB)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
MIOCENE (Miocene (undifferentiated))1 ft+2 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
889–898 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"108 ft65 sx
4.5"952 ft206 sx

Permit History (1)

Applications (1)

#336613 A ATCO PROD. CO., INC.
received 1987-09-28

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1987-11-30 log on file
W-2/G-1 1987-12-11

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HARDIN County.

Well Details

Well Number
19A
Max Depth
1,000 ft
Drill Type
Vertical
County
HARDIN
District
3
Completed
1987-11-03

Operator

Location
SOURLAKE
P-5 Status
Active (filed 2025-12-22)
Cum Oil (all leases)
1,625,820 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
50