42-199-32629

Final Completion

CAMPBELL W.T. JR. ET AL

HARDIN County · District 3 · CHENANGO OIL AND GAS CO. · SOUR LAKE

Permits

1

Max Depth

1,500 ft

First Permit

1992-03-02

Latest Activity

1992-03-02

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1992-04-07

Shut-In

Plugged

2003-06-23

!

EWA / Permit operator mismatch

Scheduling: CHENANGO OIL AND GAS CO. ≠ Permit: CASPEN OPERATING COMPANY

Resolved via: schedulingCHENANGO OIL AND GAS CO.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (1)

CSV
FormationTop Depth (MD)
FRIO-MIOCENE (Frio)900 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Perforations (1)

IntervalType
900–908 ftPerforated

Casing (1)

SizeSet DepthCement
4.5"1,186 ft180 sx

Permit History (1)

Applications (1)

#397165 A CASPEN OPERATING COMPANY
received 1992-03-02

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1992-06-10 log on file
W-2/G-1 1992-06-22

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HARDIN County.

Well Details

Well Number
10
Max Depth
1,500 ft
Drill Type
Vertical
County
HARDIN
District
3
Completed
1992-04-07

Operator

Location
GROVES
P-5 Status
Inactive (filed 1997-04-22)
Cum Oil (all leases)
34,948 bbl
Cum Gas (all leases)
2,493 mcf
Total Permits
3