42-199-32880

Final Completion

LONE ACRE

HARDIN County · District 3 · RADCO OPERATIONS L.P. · SOUR LAKE

Permits

1

Max Depth

990 ft

First Permit

2003-05-01

Latest Activity

2003-05-01

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2003-11-01

Shut-In

Plugged

2012-11-19

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2002-02

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (1) Elevation 52 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
MIOCENE (Miocene (undifferentiated))360 ft-308 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
360–366 ftPerforated

Casing (1)

SizeSet DepthCement
4.5"509 ft80 sx

Permit History (1)

Applications (1)

#531259 A RADCO OPERATIONS, L.P.
received 2003-04-29

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 2003-11-21 log on file
W-2/G-1 2003-12-04

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HARDIN County.

Well Details

Well Number
2A
Max Depth
990 ft
Drill Type
Vertical
County
HARDIN
District
3
Completed
2003-11-01

Operator

Location
SOURLAKE
P-5 Status
Active (filed 2025-12-22)
Cum Oil (all leases)
1,625,820 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
50