42-199-33321

Final Completion

MARTHA HARRISON

HARDIN County · District 3 · RADCO OPERATIONS L.P. · SOUR LAKE

Permits

1

Max Depth

2,500 ft

First Permit

2011-09-30

Latest Activity

2011-09-30

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2012-01-24

Shut-In

Plugged

2019-12-05

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2012-01

Last Production

2020-04

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (1)

CSV
FormationTop Depth (MD)
FRIO 2,270 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Perforations (1)

IntervalType
2,272–2,296 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"500 ft350 sx
5.5"2,351 ft490 sx

Permit History (1)

Applications (1)

#723022 A RADCO OPERATIONS, L.P.
received 2011-08-24

Records & Logs

1 completion filing on record · 1 with log images at RRC.

W-2/G-1 2012-03-20 log on file

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HARDIN County.

Well Details

Well Number
2
Max Depth
2,500 ft
Drill Type
Vertical
County
HARDIN
District
3
Completed
2012-01-24

Operator

Location
SOURLAKE
P-5 Status
Active (filed 2025-12-22)
Cum Oil (all leases)
1,625,820 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
50