42-199-33369

PRODUCING

TARVER - HARDIN

HARDIN County · District 3 · RADCO OPERATIONS L.P. · SOUR LAKE

Permits

1

Max Depth

2,600 ft

First Permit

2012-05-04

Latest Activity

2012-05-04

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2012-10-22

Shut-In

Plugged

P-5 Org Status: Active

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (1)

CSV
FormationTop Depth (MD)
MIOCENE (Miocene (undifferentiated))1,000 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Perforations (1)

IntervalType
2,026–2,032 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"262 ft147 sx
5.5"2,184 ft372 sx

Permit History (1)

Applications (1)

#737657 A RADCO OPERATIONS, L.P.
received 2012-04-05

Records & Logs

1 completion filing on record · 1 with log images at RRC.

W-2/G-1 2012-12-04 log on file

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HARDIN County.

Well Details

Well Number
89
Max Depth
2,600 ft
Drill Type
Vertical
County
HARDIN
District
3
Completed
2012-10-22

Operator

Location
SOURLAKE
P-5 Status
Active (filed 2025-12-22)
Cum Oil (all leases)
1,625,820 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
50