42-199-33433

PRODUCING

TARVER - HARDIN

HARDIN County · District 3 · RADCO OPERATIONS L.P. · SOUR LAKE

Permits

1

Max Depth

2,700 ft

First Permit

2013-06-17

Latest Activity

2013-06-17

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2013-10-29

Shut-In

Plugged

P-5 Org Status: Active

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (3)

CSV
FormationTop Depth (MD)
MIOCENE (Miocene (undifferentiated))1,650 ft
MIOCENE (Miocene (undifferentiated))1,970 ft
MIOCENE (Miocene (undifferentiated))2,011 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Perforations (1)

IntervalType
2,011–2,033 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"273 ft166 sx
5.5"2,109 ft406 sx

Permit History (1)

Applications (1)

#761694 A RADCO OPERATIONS, L.P.
received 2013-04-30

Records & Logs

1 completion filing on record · 1 with log images at RRC.

W-2/G-1 2014-03-03 log on file

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HARDIN County.

Well Details

Well Number
91
Max Depth
2,700 ft
Drill Type
Vertical
County
HARDIN
District
3
Completed
2013-10-29

Operator

Location
SOURLAKE
P-5 Status
Active (filed 2025-12-22)
Cum Oil (all leases)
1,625,820 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
50