Permits
1
Max Depth
7,000 ft
First Permit
1981-12-29
Latest Activity
1981-12-29
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
1982-05-19
Shut-In
—
Plugged
—
P-5 Org Status: Delinquent
EWA / Production operator mismatch
Scheduling: ROCINANTE ≠ Production: BOMCO USA, INC. (reported 2017-08)
EWA / Permit operator mismatch
Scheduling: ROCINANTE ≠ Permit: AMERICAN CRUDE, INC.
Resolved via: scheduling → ROCINANTE
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (2)
| Interval | Type |
|---|---|
| 3,662–3,666 ft | Perforated |
| 4,107–4,116 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 9.625" | 2,250 ft | 750 sx |
| 2.375" | 4,044 ft | — |
| 7" | 5,195 ft | 575 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet