42-203-31014

Final Completion

JOHNSON A

HARRISON County · District 6 · HOPEWELL OPERATING INC. · WASKOM (TRAVIS PEAK 1)

RRC Lookup

Permits

4

Max Depth

6,512 ft

First Permit

1982-12-09

Latest Activity

1999-03-08

Lifespan

16 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1991-01-11

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: HOPEWELL OPERATING INC. ≠ Production: BROOKSTON ENERGY, INC. (reported 2020-03)

Resolved via: schedulingHOPEWELL OPERATING INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#483164 A HOPEWELL OPERATING, INC.
received 1999-03-08
#384028 A SHELBY, MICHAEL H.
received 1991-01-30
#378674 A SHELBY, MICHAEL H.
received 1990-09-28
#179928 A FIELDS, BERT, JR.
received 1982-12-09

Well Details

Well Number
2
Max Depth
6,512 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
1991-01-11

Operator

Location
SHREVEPORT
P-5 Status
Y (filed 2025-10-04)
Cum Oil (all leases)
2,410,439 bbl
Cum Gas (all leases)
19,271,640 mcf
Activities
G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
118

External Links

Live © 2026 Petrora