42-203-31474

Final Completion

KNOX D. & E.K. ET AL UNIT

HARRISON County · District 6 · EP OPERATING COMPANY · WHELAN (TRAVIS PEAK PRORATED)

RRC Lookup

Permits

1

Max Depth

8,800 ft

First Permit

1986-08-26

Latest Activity

1986-08-26

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1986-12-02

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: EP OPERATING COMPANY ≠ Production: XTO ENERGY INC. (reported 2019-04)

Resolved via: schedulingEP OPERATING COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#305645 A EP OPERATING COMPANY
received 1986-08-25

Well Details

Well Number
4
Max Depth
8,800 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
1986-12-02

Operator

Location
DALLAS
P-5 Status
Y (filed 1993-01-05)
Total Permits
568

External Links

Live © 2026 Petrora