42-203-32359

Final Completion

DAVIDSON LAKE

HARRISON County · District 6 · HARLETON OIL & GAS INC. · DAVIDSON CHAPEL (WOODBINE)

Permits

1

Max Depth

4,000 ft

First Permit

1996-02-16

Latest Activity

1996-02-16

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1996-04-29

Shut-In

Plugged

2017-05-12

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1996-04

Last Production

2017-10

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (3)

CSV
FormationTop Depth (MD)
NACOTOCH1,974 ft
PECAN GAP 2,428 ft
AUSTIN CHALK 3,739 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Perforations (1)

IntervalType
3,744–3,750 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"151 ft
5.5"3,865 ft590 sx

Permit History (1)

Applications (1)

#444616 A HARLETON OIL & GAS INC.
received 1996-02-08

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1996-05-03 log on file
W-2/G-1 1996-05-16

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HARRISON County.

Well Details

Well Number
1
Max Depth
4,000 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
1996-04-29

Operator

Location
TYLER
P-5 Status
Active (filed 2025-11-14)
Cum Oil (all leases)
1,082,520 bbl
Cum Gas (all leases)
49,380,691 mcf
Activities
OPRS/G, OPRS/O
Total Permits
162