42-203-34929

Horizontal

PATRICIA POPE WHALEY GAS UNIT "B

HARRISON County · District 6 · BP AMERICA PRODUCTION COMPANY

Permits

1

Max Depth

13,500 ft

First Permit

2010-07-02

Latest Activity

2010-07-02

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2010-12

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (7)

CSV
FormationTop Depth (MD)
BOSSIER
COTTON VALLEY
JAMES (James Lime)
PALUXY
RODESSA
TRAVIS PEAK
UPPER GLENROSE (Glen Rose)

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Perforations (1)

IntervalType
10,405–13,159 ftPerforated

Casing (2)

SizeSet DepthCement
9.625"995 ft548 sx
7"10,133 ft1,631 sx

Permit History (1)

Applications (1)

#689886 A BP AMERICA PRODUCTION COMPANY
received 2010-01-18

Records & Logs

1 completion filing on record · 1 with log images at RRC.

W-2/G-1 2011-05-02 log on file

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HARRISON County.

Well Details

Well Number
4H
Max Depth
13,500 ft
Drill Type
Horizontal
County
HARRISON
District
6

Operator

Location
DENVER
P-5 Status
Active (filed 2025-07-10)
Cum Oil (all leases)
20,042,327 bbl
Cum Gas (all leases)
2,314,775,823 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O
Total Permits
1,623