42-203-35306

Final Completion

BIRDWELL GAS UNIT

HARRISON County · District 6 · HOPEWELL OPERATING INC. · WASKOM (TRAVIS PEAK 1)

RRC Lookup

Permits

2

Max Depth

6,350 ft

First Permit

2018-06-19

Latest Activity

2021-02-01

Lifespan

3 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2018-12-06

Shut-In

Plugged

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2018-12

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#867386 A HOPEWELL OPERATING, INC.
received 2021-01-28
#838850 A HOPEWELL OPERATING, INC.
received 2018-04-13
Lat 32.405727
Lon -94.047809

Well Details

Well Number
3
Max Depth
6,350 ft
Drill Type
Vertical
County
HARRISON
District
6
Completed
2018-12-06

Operator

Location
SHREVEPORT
P-5 Status
Y (filed 2025-10-04)
Cum Oil (all leases)
2,410,439 bbl
Cum Gas (all leases)
19,271,640 mcf
Activities
G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
118

External Links

Live © 2026 Petrora