42-211-31273
Final CompletionGRACIE 117
HEMPHILL County · District 10 · NEWTON CORP. THE · BIG TIMBER CREEK (DOUGLAS)
Permits
2
Max Depth
7,800 ft
First Permit
1980-09-19
Latest Activity
1991-03-05
Lifespan
10 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1990-10-21
Shut-In
—
Plugged
—
!
EWA / Production operator mismatch
Scheduling: NEWTON CORP. THE ≠ Production: GREAT PLAINS OPERATING, LLC. (reported 2010-05)
!
EWA / Permit operator mismatch
Scheduling: NEWTON CORP. THE ≠ Permit: PARALLEL PETROLEUM CORPORATION
Resolved via: scheduling → NEWTON CORP. THE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#384636 A PARALLEL PETROLEUM CORPORATION
received 1991-02-14
#93357 A MOODY ENERGY CO.
received 1980-09-19
Well Details
- Well Number
- 1
- Max Depth
- 7,800 ft
- Drill Type
- Vertical
- County
- HEMPHILL
- District
- 10
- Operator
- NEWTON CORP. THE
- Completed
- 1990-10-21
Operator
- Name
- NEWTON CORP.,THE
- Location
- DALLAS
- P-5 Status
- Y (filed 2021-11-05)
- Cum Oil (all leases)
- 51,957 bbl
- Cum Gas (all leases)
- 112,223 mcf
- Total Permits
- 1