Permits
2
Max Depth
13,000 ft
First Permit
1983-10-05
Latest Activity
1996-05-14
Lifespan
13 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
1984-04-28
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1996-08
Last Production
1997-06
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (2) Elevation 2,264 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| DOUGLAS | 7,478 ft | -5,214 ft |
| TONKAWA | 8,195 ft | -5,931 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (4)
| Interval | Type |
|---|---|
| 7,492–7,498 ft | Perforated |
| 7,504–7,510 ft | Perforated |
| 7,620–7,640 ft | Perforated |
| 8,209–8,216 ft | Perforated |
Casing (1)
| Size | Set Depth | Cement |
|---|---|---|
| 5.5" | 8,503 ft | 350 sx |
Permit History (2)
Applications (2)
Records & Logs
2 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 13,000 ft
- Drill Type
- Vertical
- County
- HEMPHILL
- District
- 10
- Operator
- CANYON EXPLORATION CO.
Operator
- Name
- CANYON EXPL CO
- Location
- AMARILLO
- P-5 Status
- Inactive (filed 2017-07-05)
- Cum Oil (all leases)
- 481,290 bbl
- Cum Gas (all leases)
- 857,706 mcf
- Total Permits
- 44