42-211-32125
Final CompletionHOOVER LOUISE ET AL C
HEMPHILL County · District 10 · BP AMERICA PRODUCTION COMPANY · HEMPHILL (GRANITE WASH.)
Permits
2
Max Depth
10,950 ft
First Permit
1995-09-15
Latest Activity
1999-07-29
Lifespan
4 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1995-12-23
Shut-In
—
Plugged
—
EWA / Production operator mismatch
Scheduling: BP AMERICA PRODUCTION COMPANY ≠ Production: MMGL TXPH, LLC (reported 2026-04)
EWA / Permit operator mismatch
Scheduling: BP AMERICA PRODUCTION COMPANY ≠ Permit: CRESCENDO RESOURCES, L.P.
Resolved via: production → MMGL TXPH, LLC
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1995-12
Last Production
2026-07
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (16) Elevation 2,620 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| PAN LIME | 3,373 ft | -753 ft |
| PAN LM | 3,373 ft | -753 ft |
| BD | 4,204 ft | -1,584 ft |
| PENN SH (Pennsylvanian) | 5,948 ft | -3,328 ft |
| U DG | 7,505 ft | -4,885 ft |
| U. DOUGLAS | 7,505 ft | -4,885 ft |
| L DG | 7,743 ft | -5,123 ft |
| L. DOUGLAS | 7,743 ft | -5,123 ft |
| TONK | 8,259 ft | -5,639 ft |
| KC | 8,750 ft | -6,130 ft |
| CLEVELAND PAY (Cleveland) | 9,512 ft | -6,892 ft |
| CLEVE PAY | 9,512 ft | -6,892 ft |
| OSWEGO LIME (Oswego) | 9,936 ft | -7,316 ft |
| OSWEGO LM (Oswego) | 9,936 ft | -7,316 ft |
| GW | 10,257 ft | -7,637 ft |
| GW | 10,527 ft | -7,907 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (5)
| Interval | Type |
|---|---|
| 7,749–7,759 ft | Perforated |
| 10,656–10,672 ft | Perforated |
| 10,726–10,790 ft | Perforated |
| 10,854–10,888 ft | Perforated |
| 10,902–10,930 ft | Perforated |
Casing (5)
| Size | Set Depth | Cement |
|---|---|---|
| 13.375" | 464 ft | 485 sx |
| 13.375" | 464 ft | 485 sx |
| 8.625" | 2,691 ft | 1,552 sx |
| 4.5" | 11,100 ft | 75 sx |
| 4.5" | — | 415 sx |
Permit History (2)
Applications (2)
Records & Logs
4 completion filings on record · 2 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 4
- Max Depth
- 10,950 ft
- Drill Type
- Vertical
- County
- HEMPHILL
- District
- 10
- Operator
- BP AMERICA PRODUCTION COMPANY
- Completed
- 1995-12-23
Operator
- Name
- BP AMERICA PROD CO
- Location
- DENVER
- P-5 Status
- Active (filed 2025-07-10)
- Cum Oil (all leases)
- 20,042,327 bbl
- Cum Gas (all leases)
- 2,314,775,823 mcf
- Activities
- CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O
- Total Permits
- 1,623