42-215-30965

Final Completion

RAYMOND GEE GAS UNIT

HIDALGO County · District 4 · AMERICAN QUASAR PETROLEUM CO. · EDINBURG (8800)

Permits

2

Max Depth

12,667 ft

First Permit

1979-10-03

Latest Activity

1981-08-03

Lifespan

2 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-05-07

Shut-In

Plugged

1983-06-29

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (2)

IntervalType
7,325–10,902 ftPerforated
8,802–8,816 ftPerforated

Casing (5)

SizeSet DepthCement
10.75"2,030 ft1,625 sx
5"2,178 ft
2.375"7,186 ft
2.5"8,695 ft
7.625"9,508 ft615 sx

Permit History (2)

Applications (2)

#128262 A AMERICAN QUASAR PETROLEUM CO.
received 1981-08-03
#59612 A AMERICAN QUASAR PETROLEUM CO.
received 1979-10-03

Records & Logs

2 completion filings on record.

W-2/G-1 1981-08-24
W-2/G-1 1980-06-17

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HIDALGO County.

Well Details

Well Number
1
Max Depth
12,667 ft
Drill Type
Vertical
County
HIDALGO
District
4
Completed
1980-05-07

Operator

Location
FORT WORTH
P-5 Status
Inactive (filed 1986-11-21)
Total Permits
106