42-215-31070

Final Completion

LUITJEN

HIDALGO County · District 4 · AMERICAN PUBLIC ENERGY CO. · MISSION WEST (F)

Permits

3

Max Depth

8,500 ft

First Permit

1980-08-26

Latest Activity

1983-04-04

Lifespan

3 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-03-18

Shut-In

Plugged

1983-11-26

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (3)

IntervalType
7,212–7,217 ftPerforated
7,212–7,224 ftPerforated
7,444–7,446 ftPerforated

Casing (7)

SizeSet DepthCement
9.625"2,029 ft1,000 sx
2.375"6,812 ft
2.875"7,098 ft
2.375"7,430 ft
5.5"7,524 ft850 sx
5.5"7,524 ft
5.5"

Permit History (3)

Applications (3)

#193845 A AMERICAN PUBLIC ENERGY CO.
received 1983-04-04
#161159 A AMERICAN PUBLIC ENERGY CO.
received 1982-05-19
#91637 A AMERICAN PUBLIC ENERGY CO.
received 1980-08-26

Records & Logs

3 completion filings on record.

W-2/G-1 1982-09-16
W-2/G-1 1982-04-21
W-2/G-1 1980-12-05

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HIDALGO County.

Well Details

Well Number
1
Max Depth
8,500 ft
Drill Type
Vertical
County
HIDALGO
District
4
Completed
1982-03-18

Operator

Location
DALLAS
P-5 Status
Inactive (filed 1981-12-01)
Total Permits
77