42-215-31374

Final Completion

WOLCOTT

HIDALGO County · District 4 · DENOVO OIL & GAS INC. · WHITTED N. (8046 SD.)

Permits

1

Max Depth

8,200 ft

First Permit

1983-09-02

Latest Activity

1983-09-02

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-10-07

Shut-In

Plugged

1987-12-29

!

EWA / Permit operator mismatch

Scheduling: DENOVO OIL & GAS INC. ≠ Permit: GOLDKING PROD. CO.

Resolved via: schedulingDENOVO OIL & GAS INC.

Operator History

originally filed by GOLDKING PROD. CO. — asset transferred

Formation Tops (3)

CSV
FormationTop Depth (MD)
HARDING5,892 ft
FIRSTENBERG6,771 ft
VICKSBURG 7,329 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Perforations (1)

IntervalType
8,046–8,065 ftPerforated

Casing (2)

SizeSet DepthCement
10.75"1,102 ft955 sx
5.5"8,455 ft1,400 sx

Permit History (1)

Applications (1)

#209954 A GOLDKING PROD. CO.
received 1983-09-12

Records & Logs

2 completion filings on record.

W-2/G-1 1983-12-30
W-2/G-1 1983-12-30

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HIDALGO County.

Well Details

Well Number
1
Max Depth
8,200 ft
Drill Type
Vertical
County
HIDALGO
District
4
Completed
1983-10-07

Operator

Location
HOUSTON
P-5 Status
Inactive (filed 1995-07-18)
Cum Oil (all leases)
298,488 bbl
Cum Gas (all leases)
1,149,088 mcf
Total Permits
43