Permits
3
Max Depth
13,200 ft
First Permit
1997-09-17
Latest Activity
2007-10-11
Lifespan
10 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1998-01
Last Production
2026-07
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (5) Elevation 25 ft (KB)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| 6500 SAND | 6,591 ft | -6,566 ft |
| 6900 SAMD | 7,000 ft | -6,975 ft |
| CARD SAND | 7,530 ft | -7,505 ft |
| 8500 SAND | 8,625 ft | -8,600 ft |
| HANSEN SAND | 9,633 ft | -9,608 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 10,425–10,804 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 13.375" | 2,500 ft | 1,300 sx |
| 9.625" | 8,711 ft | 1,675 sx |
Permit History (3)
Applications (3)
Records & Logs
3 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 58
- Max Depth
- 13,200 ft
- Drill Type
- Directional
- County
- HIDALGO
- District
- 4
- Operator
- SHELL WESTERN E&P
Operator
- Name
- SHELL WESTERN E&P
- Location
- HOUSTON
- P-5 Status
- Delinquent (filed 2021-01-04)
- Cum Oil (all leases)
- 109,966,284 bbl
- Cum Gas (all leases)
- 1,378,771,265 mcf
- Activities
- GTHS/C, GTHS/O
- Total Permits
- 1,756