42-227-32126

Final Completion

BUCHANAN 26

HOWARD County · District 8 · BLANKS ENERGY CORPORATION · HUTTO SOUTH (CLEAR FORK)

Permits

1

Max Depth

9,800 ft

First Permit

1980-03-12

Latest Activity

1980-03-12

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-05-13

Shut-In

Plugged

1983-05-10

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
4,492–5,267 ftPerforated

Casing (4)

SizeSet DepthCement
13.375"332 ft1,712 sx
8.625"3,204 ft1,100 sx
2.375"5,273 ft
4.5"5,341 ft778 sx

Permit History (1)

Applications (1)

#74996 A BLANKS ENERGY CORPORATION
received 1980-03-12

Records & Logs

1 completion filing on record.

W-2/G-1 1980-11-21

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HOWARD County.

Well Details

Well Number
1
Max Depth
9,800 ft
Drill Type
Vertical
County
HOWARD
District
8
Completed
1980-05-13

Operator

Location
MIDLAND
P-5 Status
Inactive (filed 1995-02-09)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf
Total Permits
71