42-233-31520
Final CompletionWISDOM
HUTCHINSON County · District 10 · RAMSEY PROPERTY MANAGEMENT INC. · PANHANDLE E.(ALBANY DOLMITE LO)
Permits
1
Max Depth
3,300 ft
First Permit
1982-11-19
Latest Activity
1982-11-19
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-01-20
Shut-In
—
Plugged
1988-08-29
EWA / Permit operator mismatch
Scheduling: RAMSEY PROPERTY MANAGEMENT INC. ≠ Permit: PATHFINDER PETROLEUM CORPORATION
Resolved via: scheduling → RAMSEY PROPERTY MANAGEMENT INC.
Operator History
originally filed by PATHFINDER PETROLEUM CORPORATION — asset transferred
Formation Tops (6) Elevation 3,281 ft (GL)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| RED BEDS | 465 ft | +2,816 ft |
| TUBBS | 1,758 ft | +1,523 ft |
| CIMARRON | 1,900 ft | +1,381 ft |
| RED CAVE | 2,137 ft | +1,144 ft |
| PANHANDLE LIME | 2,486 ft | +795 ft |
| BROWN DOLOMITE | 3,056 ft | +225 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 3,108–3,172 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 482 ft | 270 sx |
| 5.5" | 3,255 ft | 150 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 3-2
- Max Depth
- 3,300 ft
- Drill Type
- Vertical
- County
- HUTCHINSON
- District
- 10
- Operator
- RAMSEY PROPERTY MANAGEMENT INC.
- Completed
- 1983-01-20
Operator
- Location
- OKLAHOMA CI, TY
- P-5 Status
- Inactive (filed 1996-08-27)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- 79,086 mcf
- Total Permits
- 2