Permits
2
Max Depth
10,000 ft
First Permit
2004-03-15
Latest Activity
2006-05-25
Lifespan
2 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2006-05-15
Shut-In
—
Plugged
—
EWA / Production operator mismatch
Scheduling: GO & GO ≠ Production: TRIO CONSULTING & MANAGEMENT,LLC (reported 2026-04)
Resolved via: production → TRIO CONSULTING & MANAGEMENT,LLC
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2004-06
Last Production
2026-07
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (3) Elevation 2,450 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| FUSSELMAN | 8,730 ft | -6,280 ft |
| FUSSELMAN | 8,742 ft | -6,292 ft |
| ELLENBURGER | 8,910 ft | -6,460 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (5)
| Interval | Type |
|---|---|
| 8,730–8,750 ft | Perforated |
| 8,879–8,885 ft | Perforated |
| 8,954–8,965 ft | Perforated |
| 8,984–8,991 ft | Perforated |
| 9,000–9,024 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 11.75" | 595 ft | 355 sx |
| 8.625" | 3,500 ft | 1,250 sx |
| 5.5" | 9,150 ft | 225 sx |
Permit History (2)
Applications (2)
Records & Logs
5 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet