42-237-34109

Final Completion

MCALISTER

JACK County · District 9 · TAYLOR G. E. · PLEMONS (CONGLOMERATE)

Permits

1

Max Depth

5,700 ft

First Permit

1981-10-22

Latest Activity

1981-10-22

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-12-15

Shut-In

Plugged

1989-06-01

!

EWA / Permit operator mismatch

Scheduling: TAYLOR G. E. ≠ Permit: TAYLOR OPER. CO.

Resolved via: schedulingTAYLOR G. E.

Operator History

originally filed by TAYLOR OPER. CO. — asset transferred

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
4,849–4,854 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"341 ft235 sx
2.375"4,862 ft
4.5"5,720 ft520 sx

Permit History (1)

Applications (1)

#137699 A TAYLOR OPER. CO.
received 1981-10-22

Records & Logs

1 completion filing on record.

W-2/G-1 1981-12-21

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in JACK County.

Well Details

Well Number
1
Max Depth
5,700 ft
Drill Type
Vertical
County
JACK
District
9
Operator
TAYLOR G. E.
Completed
1981-12-15

Operator

Location
BRIDGEPORT
P-5 Status
Inactive (filed 2000-02-23)
Cum Oil (all leases)
34,037 bbl
Cum Gas (all leases)
1,113,859 mcf
Total Permits
5