42-237-36521
Final CompletionKIRK L.
JACK County · District 9 · SMITH PIPE OF ABILENE · POST OAK (ELLENBURGER)
Permits
1
Max Depth
6,700 ft
First Permit
1984-11-16
Latest Activity
1984-11-16
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-02-11
Shut-In
—
Plugged
1992-10-30
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: RICHEY & COMPANY, INC.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Operator History
originally filed by RICHEY & COMPANY, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (5) Elevation 990 ft
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| CADDO LIME (Caddo) | 5,471 ft | -4,481 ft |
| ATOKA CONGLOMERATE (Atoka) | 5,670 ft | -4,680 ft |
| ATOKA CONGLOMETATE (Atoka) | 5,670 ft | -4,680 ft |
| MARBLE FALLS | 6,019 ft | -5,029 ft |
| ELLENBURGER | 6,260 ft | -5,270 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 6,260–6,268 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 280 ft | 276 sx |
| 4.5" | 6,390 ft | 250 sx |
Permit History (1)
Applications (1)
Records & Logs
4 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 6,700 ft
- Drill Type
- Vertical
- County
- JACK
- District
- 9
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1985-02-11
Operator
- Location
- ABILENE
- P-5 Status
- Inactive (filed 2014-08-29)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf