42-237-37569
Final CompletionELLIS
JACK County · District 9 · GATOR ENERGY · DEES (ATOKA CONGLOMERATE)
Permits
1
Max Depth
6,000 ft
First Permit
1988-11-22
Latest Activity
1988-11-22
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1988-12-27
Shut-In
—
Plugged
—
!
EWA / Production operator mismatch
Scheduling: GATOR ENERGY ≠ Production: ARROWHEAD PRODUCTIONS, LP (reported 2020-03)
Resolved via: scheduling → GATOR ENERGY
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#353510 A GATOR ENERGY
received 1988-11-21
Well Details
- Well Number
- 1
- Max Depth
- 6,000 ft
- Drill Type
- Vertical
- County
- JACK
- District
- 9
- Operator
- GATOR ENERGY
- Completed
- 1988-12-27
Operator
- Name
- GATOR ENGY
- Location
- JACKSBORO
- P-5 Status
- Y (filed 1994-04-02)
- Cum Oil (all leases)
- 522 bbl
- Cum Gas (all leases)
- 7,439 mcf
- Total Permits
- 12