Permits
3
Max Depth
6,275 ft
First Permit
1979-06-13
Latest Activity
1990-01-15
Lifespan
11 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (2)
| Interval | Type |
|---|---|
| 4,700–4,704 ft | Perforated |
| 5,315–5,322 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 537 ft | 290 sx |
| 2.875" | 6,270 ft | 1,085 sx |
Permit History (3)
Applications (4)
Records & Logs
3 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet