42-239-31583
Final CompletionHULTQUIST
JACKSON County · District 2 · OAK CLIFF ENGINEERING INC. · GANADO NORTH (FRIO 6680)
Permits
4
Max Depth
7,500 ft
First Permit
1981-11-30
Latest Activity
1989-07-18
Lifespan
8 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-12-07
Shut-In
—
Plugged
1991-01-16
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (4) Elevation 61 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| MARGULINA | 5,020 ft | -4,959 ft |
| TOP OF MARG | 5,020 ft | -4,959 ft |
| FRIO | 5,390 ft | -5,329 ft |
| TOP OF FRIO (Frio) | 5,390 ft | -5,329 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (4)
| Interval | Type |
|---|---|
| 6,419–6,424 ft | Perforated |
| 6,528–6,530 ft | Perforated |
| 6,600–6,604 ft | Perforated |
| 6,680–6,682 ft | Perforated |
Casing (5)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 535 ft | 435 sx |
| 2" | 6,350 ft | — |
| 2" | 6,375 ft | — |
| 4.5" | 6,969 ft | 1,296 sx |
| 4.5" | 6,969 ft | 1,296 sx |
Permit History (4)
Applications (4)
Records & Logs
8 completion filings on record · 3 with log images at RRC.
+2 more filings
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 7,500 ft
- Drill Type
- Vertical
- County
- JACKSON
- District
- 2
- Operator
- OAK CLIFF ENGINEERING INC.
- Completed
- 1985-12-07
Operator
- Location
- DALLAS
- P-5 Status
- Inactive (filed 1988-11-07)
- Total Permits
- 10