42-239-32063

Final Completion

HAYNES GAS UNIT

JACKSON County · District 2 · TXO PRODUCTION CORP. · MORALES (FRIO 4090 STRAY)

Permits

1

Max Depth

4,800 ft

First Permit

1984-07-13

Latest Activity

1984-07-13

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-07-24

Shut-In

Plugged

1986-02-17

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
4,093–4,096 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"1,729 ft655 sx
2.875"4,295 ft900 sx

Permit History (1)

Applications (1)

#244935 A TXO PRODUCTION CORP.
received 1984-07-12

Records & Logs

2 completion filings on record.

W-2/G-1 1984-08-23
W-2/G-1 1984-07-26

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in JACKSON County.

Well Details

Well Number
1A
Max Depth
4,800 ft
Drill Type
Vertical
County
JACKSON
District
2
Completed
1984-07-24

Operator

Location
DALLAS
P-5 Status
Inactive (filed 1990-11-02)
Total Permits
3,227