Permits
1
Max Depth
7,865 ft
First Permit
1984-06-22
Latest Activity
1984-06-22
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-10-02
Shut-In
—
Plugged
1987-02-05
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (2)
| Interval | Type |
|---|---|
| 7,204–7,219 ft | Perforated |
| ?–7,650 ft | Perforated |
Permit History (1)
Applications (1)
#243959 A TEXACO INC.
received 1984-05-08
Records & Logs
2 completion filings on record.
W-2/G-1 1984-10-10
W-2/G-1 1984-01-12
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in JEFFERSON County.
Well Details
- Well Number
- 2
- Max Depth
- 7,865 ft
- Drill Type
- Vertical
- County
- JEFFERSON
- District
- 3
- Operator
- TEXACO INC.
- Completed
- 1984-10-02
Operator
- Name
- TEXACO INC
- Location
- MIDLAND
- P-5 Status
- Inactive (filed 1996-11-27)
- Total Permits
- 4,906