Permits
1
Max Depth
2,600 ft
First Permit
1980-04-30
Latest Activity
1980-04-30
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1980-07-02
Shut-In
—
Plugged
1982-12-07
EWA / Permit operator mismatch
Scheduling: GENESIS ≠ Permit: STONE, M. L.
Resolved via: scheduling → GENESIS
Operator History
originally filed by STONE, M. L. — asset transferred
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (1)
| Interval | Type |
|---|---|
| 2,334–2,350 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 7.625" | 300 ft | 65 sx |
| 2.375" | 2,209 ft | — |
| 4.5" | 2,524 ft | 335 sx |
Permit History (1)
Applications (1)
Records & Logs
1 completion filing on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet