42-253-30466

Final Completion

PHILLIPS HOWARD MRS.

JONES County · District 7 · RIDLEY J. K. · NOODLE W. (NOODLE CREEK)

Permits

2

Max Depth

4,800 ft

First Permit

1978-06-05

Latest Activity

1980-08-04

Lifespan

2 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1978-05-15

Shut-In

Plugged

1994-06-09

!

EWA / Production operator mismatch

Scheduling: RIDLEY J. K. ≠ Production: STAR PRODUCTION, INC. (reported 2002-05)

Resolved via: schedulingRIDLEY J. K.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2007-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (2)

IntervalType
2,527–2,559 ftPerforated
4,132–4,140 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"137 ft75 sx
2.375"4,320 ft
5.5"4,337 ft350 sx

Permit History (2)

Applications (2)

#88584 A RIDLEY, J. K.
received 1980-08-04
#25798 A RIDLEY, J. K.
received 1978-06-05

Records & Logs

4 completion filings on record.

W-2/G-1 1985-04-26
W-2/G-1 1985-05-17
W-2/G-1 1978-06-23
W-2/G-1 1976-02-24

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in JONES County.

Well Details

Well Number
8
Max Depth
4,800 ft
Drill Type
Vertical
County
JONES
District
7
Operator
RIDLEY J. K.
Completed
1978-05-15

Operator

Location
ABILENE
P-5 Status
Inactive (filed 1991-09-20)
Total Permits
14