42-253-30957
Final CompletionMCLEOD H.H.
JONES County · District 7 · DAVIS PRODUCTION · NOODLE NW. (NOODLE CREEK)
Permits
3
Max Depth
5,500 ft
First Permit
1977-11-18
Latest Activity
1992-08-28
Lifespan
15 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1992-07-08
Shut-In
—
Plugged
1994-03-30
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1995-02
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (1) Elevation 1,858 ft (GL)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| NOODLE CREEK | 2,519 ft | -661 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (4)
| Interval | Type |
|---|---|
| 2,519–2,529 ft | Perforated |
| 2,541–2,547 ft | Perforated |
| 4,480–5,408 ft | Perforated |
| 4,700–4,710 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 106 ft | 435 sx |
| 2.375" | 4,680 ft | — |
| 4.5" | 5,455 ft | 175 sx |
Permit History (3)
Applications (3)
Records & Logs
4 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 5,500 ft
- Drill Type
- Vertical
- County
- JONES
- District
- 7
- Operator
- DAVIS PRODUCTION
- Completed
- 1992-07-08
Operator
- Name
- DAVIS PROD
- Location
- ABILENE
- P-5 Status
- Inactive (filed 2004-03-02)
- Cum Oil (all leases)
- 3,832 bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 17