42-253-31202

Final Completion

HARRISON

JONES County · District 7 · SMITH PIPE OF ABILENE · NOODLE NW. (CANYON SD. 3900)

Permits

1

Max Depth

5,000 ft

First Permit

1979-06-20

Latest Activity

1979-06-20

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-06-03

Shut-In

Plugged

1993-06-22

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: PACER PETROLEUM, INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1994-12

Operator History

originally filed by PACER PETROLEUM, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
3,920–3,980 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"161 ft100 sx
2.375"3,828 ft
4.5"4,113 ft492 sx

Permit History (1)

Applications (1)

#51208 A PACER PETROLEUM, INC.
received 1979-06-20

Records & Logs

1 completion filing on record.

W-2/G-1 1979-07-13

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in JONES County.

Well Details

Well Number
2
Max Depth
5,000 ft
Drill Type
Vertical
County
JONES
District
7
Completed
1979-06-03

Operator

Location
ABILENE
P-5 Status
Inactive (filed 2014-08-29)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf