42-253-31283

Final Completion

HARRISON

JONES County · District 7 · PACER PETROLEUM INC. · NOODLE NW (CANYON SD. 4030

Permits

1

Max Depth

5,000 ft

First Permit

1979-10-11

Latest Activity

1979-10-11

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-10-26

Shut-In

Plugged

1981-08-04

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
4,044–4,057 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"171 ft100 sx
2.375"4,030 ft
4.5"4,120 ft525 sx

Permit History (1)

Applications (1)

#60234 A PACER PETROLEUM, INC.
received 1979-10-11

Records & Logs

1 completion filing on record.

W-2/G-1 1979-11-21

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in JONES County.

Well Details

Well Number
3
Max Depth
5,000 ft
Drill Type
Vertical
County
JONES
District
7
Completed
1979-10-26

Operator

Location
ABILENE
P-5 Status
Inactive (filed 1990-01-10)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf
Total Permits
36