Permits
1
Max Depth
3,300 ft
First Permit
1980-09-23
Latest Activity
1980-09-23
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1986-03-01
Shut-In
—
Plugged
2001-05-17
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2003-08
Injection / Disposal
Permitted Volume
600 bbl/d
Max Pressure
1,000 psi
Injection Interval
2,852–2,864 ft
Injected (12mo)
—
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (7) Elevation 1,846 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| B/CJ | 2,316 ft | -470 ft |
| B/COLEMAN JCT. | 2,316 ft | -470 ft |
| T/FLIPPEN | 2,840 ft | -994 ft |
| HOPE | 2,972 ft | -1,126 ft |
| HOPE LM. | 2,972 ft | -1,126 ft |
| SWASTIKA SD | 3,196 ft | -1,350 ft |
| SWASTIKA SD. | 3,196 ft | -1,350 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 2,852–2,864 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 100 ft | 75 sx |
| 4.5" | 2,895 ft | 150 sx |
Permit History (1)
Applications (2)
Records & Logs
3 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 2
- Max Depth
- 3,300 ft
- Drill Type
- Vertical
- County
- JONES
- District
- 7
- Operator
- HOFCO INC.
- Completed
- 1986-03-01
Operator
- Name
- HOFCO, INC
- Location
- ABILENE
- P-5 Status
- Inactive (filed 2022-05-27)
- Cum Oil (all leases)
- 149,161 bbl
- Cum Gas (all leases)
- 193,565 mcf
- Total Permits
- 143