42-253-34423

Final Completion

BACHHOFER

JONES County · District 7 · POLK PETROLEUM INC. · JONES COUNTY REGULAR

Permits

2

Max Depth

4,300 ft

First Permit

1997-10-20

Latest Activity

1997-10-20

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1997-11-05

Shut-In

Plugged

2001-12-29

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1997-11

Last Production

2002-02

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (2) Elevation 1,740 ft (KB)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
TOP FLIPPEN2,452 ft-712 ft
TOP PALO PINTO (Palo Pinto)3,907 ft-2,167 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
3,910–3,924 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"181 ft140 sx
5.5"4,064 ft560 sx

Permit History (2)

Applications (3)

#468911 A POLK PETROLEUM, INC.
received 1998-01-29
#468911 Pending POLK PETROLEUM, INC.
received 1998-01-15
#468911 A POLK PETROLEUM, INC.
received 1997-10-16

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1997-12-10 log on file
W-2/G-1 1998-07-13

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in JONES County.

Well Details

Well Number
1
Max Depth
4,300 ft
Drill Type
Vertical
County
JONES
District
7
Completed
1997-11-05

Operator

Location
ABILENE
P-5 Status
Inactive (filed 2025-03-19)
Cum Oil (all leases)
644,408 bbl
Cum Gas (all leases)
— mcf
Total Permits
61